Sign In | Join Free | My fazendomedia.com
China Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd logo
Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd
Lipu Dedicated to Designing and Manufacturing Ore-dressing and Drying Equipment
Active Member

9 Years

Home > Stone Crushing Plant >

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

  • 1
  • 2

Brand Name : Lipu

Model Number : According to customer

Certification : ISO9001:2008,CE,IQNet

Place of Origin : China

MOQ : 1set

Price : negotiable

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 15 sets/quarter

Delivery Time : 15-20 days

Packaging Details : Container

Product Name : Primary and Secondary Stone Crushing Plant

Model : According to customer

Color : According to customer

Condition : New

Application : Gold Ore Crushing Dressing Plant

Contact Now

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

Professional manufacturer of LIPU provide first-class stone crusher plant and mobile stone crusher plant

for sale. We provide types of crushers for ores crushing and stone crushing process that contains primary

crushers, secondary crusher and tertiary crushing, the most widely used crusher machines are jaw

crusher, impact crusher, cone crusher and vertical shaft impact crusher, in addition, mobile crushing plant

is the portable crusher equipment for mining process of stone crushing that brings many conveniences to

customers.

Process Flows of Stone Crusher Plant

Stone crushing plant process generally divided into two section process flow and three sections process

flow. Of course, when a big scale of dressing plant, undressed ore block is very big also, in order to

reduce paragraphs crushing ratio, or to get more fine equipment granularity, also can use four part

process flow.

Two Process Flow of Stone Crusher Plant

Two paragraphs crushing process: two paragraphs process is divided into two sections: two paragraphs

opened-circuit and two paragraphs closed-circuit. Two segments of the closed-circuit paragraph in

secondary crushing machines and screening equipment into closed-circuit, this can ensure that

equipment size meets the requirement, and not influence next grinding operations.

Two sections of flow only suitable for mining technology of small mining equipment, its total crushing ratio

is not big, generally in 15-25. If the undressed ore block is less than 300mm, it needs not to first crush

after the first screening get 75-0mm, only 300-75mm must be sent to crushing equipment. Then the

stones of the first screened and the first crushed into secondary crushing together (Sieve hole for 15mm),

and get the 15-0mm stones are the finally ore size and the qualified granularity. More than 15m

unqualified equipment continued to broken, until the granularity comply with requirements.

Two paragraphs opened-circuit are not very widely used, they are only applied in some heavy mining

equipment of stone crushing plant, where received materials are carried into roller grinding mill. Besides,

mostly stone crushing plants apply two paragraphs closed-circuit plant.

Three Process Flow of Stone Crushing Plant

Three paragraphs crushing process is also divided into two sections: Three paragraphs opened-circuit

and three paragraphs closed-circuit. Before the third crushing process materials can be prescreened, but

also need not prescreening in the first crushing and secondary crushing process. Three paragraphs

opened-circuit plant general is rarely used, because it cannot guarantee the requirement of the ultimate

size. Three paragraphs closed-circuit, that means in the third paragraph of the plant, this is the most

common process. It's suitable for large, medium and small dressing plant; it has a fairly large crushing

ratio which can reach 25-200, the biggest feed size can reach about 1000mm, and the minimum row grain-

size can be reached 12mm or more fine.

Normal Configuration of Stone Crusher Plant

40 -60 TPH

Hopper + vibrating feeder + jaw crusher (PE-500×750) + impact crusher (PF-1010) or cone crusher (HPC

160) + vibrating screen

80 - 120 TPH

Hopper + vibrating feeder + jaw crusher (PE-600×900) + impact crusher (PF-1214) or cone crusher (CS 4

1/4) + vibrating screen

150 - 200 TPH

Hopper + vibrating feeder + jaw crusher (PE-750×1060) + impact crusher (PF-1315) or cone crusher

(HPC 220) + vibrating screen

250 - 300 TPH

Hopper + vibrating feeder + jaw crusher (PE-500×750) + two impact crushers (PF-11315) or cone crusher

(HPC 220) + vibrating screen

Case:

Algeria 200TPH Stone Crushing Plant

Date : June 2010

Location : Algeria

Material: Granite

Max. diameter: 450mm

Moh’s hardness: 6-7

Designing production: 200TPH

Working hours: 10 hours per day

Processing flow and equipment:

Primary crushing, secondary crushing, screening.

Product size: 3/8”, 1/2”, 3/4”

Product Equipment Model Qty Cavity Type/Screen Layers Outlet Size/ Screen Mesh Size Power
Feeding GZD 1200*4900 1 15kw
Primary Crushing PE 750*1060 1 140 110kw
Secondary Crushing CS Series 4 1/4” 1 Std Coarse 18 155kw
Screening 3YK1860 1 3 9 mm 30kw

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment


Product Tags:

stone crusher

      

stone crushing machinery

      
Best Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment wholesale

Primary And Secondary Stone Crushing Plant / Gold Crushing Equipment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)